How can I check my staff level from one interval to the next?
Throughout the entire day, staff members will be starting and finishing their shifts. So, your team will fluctuate from one interval to another.
Your metrics will show your team member figure at the current interval but also for the next interval should the Break List detects a fluctuation.
JKT are decreasing from 6 to 2 from the current interval to the next.
DEA are increasing from 6 to 7 from the current interval to the next.
Your overall figure is decreasing from 12 to 9 from the current interval to the next.

Updated on: 17/08/2023
Thank you!